SpaceX won’t remove all of xAI’s unpermitted turbines for another year

SpaceX said on Thursday that it will remove the unpermitted turbines powering its xAI data centers near Memphis as it transitions to a permanent, 1.2 gigawatt natural gas power plant.
The turbines won’t be completely removed until July 2027, though. SpaceX said that it’s currently operating 69 gas turbines to power the Colossus data centers, of which many have been operating for months. The NAACP and Southern Environmental Law Center have sued xAI over the use of unpermitted turbines.
SpaceX acquired xAI in February. In its IPO filing, SpaceX said it plans to buy $2.8 billion worth of gas turbines for its data centers over the next three years.
The company claims that it is allowed to operate the existing turbines without permits because they remain on the trailers they were shipped on. But federal regulations say that the turbines xAI has been using, regardless of what they sit on, require permits because of their size and how they’re being used.
The turbines are currently located south of Memphis in Mississippi, just over the border with Tennessee. The region is among the most polluted in the U.S., and xAI has been operating gas turbines that have the potential to emit more than 2,000 tons of smog-forming NO x per year.
Last month, the Department of Justice sided with SpaceX in the NAACP’s lawsuit, saying the unpermitted turbines were a matter of “national, economic, and energy security.”
The new power plant that SpaceX is building will consist of 41 gas turbines ranging in size from 16.48 megawatts to 50 megawatts, according to permit documents issued by the state of Mississippi. They appear to be different from those currently in use, though TechCrunch could not verify the specific models of the 69 existing turbines.
Earlier this year, Elon Musk bought APR Energy, a company that specializes in temporary natural gas power. Based on an archive of the company’s site before it was taken down, the turbines in the company’s fleet also appear to be different from those cited in permits for the new, permanent power plant.
Given that APR Energy’s turbines aren’t likely to be part of the new Colossus power plant, the new turbine fleet is likely intended for another, unannounced project.
When you purchase through links in our articles, we may earn a small commission . This doesn’t affect our editorial independence.

Tim De Chant is a senior climate reporter at TechCrunch. He has written for a wide range of publications, including Wired magazine, the Chicago Tribune, Ars Technica, The Wire China, and NOVA Next, where he was founding editor.
De Chant is also a lecturer in MIT’s Graduate Program in Science Writing, and he was awarded a Knight Science Journalism Fellowship at MIT in 2018, during which time he studied climate technologies and explored new business models for journalism. He received his PhD in environmental science, policy, and management from the University of California, Berkeley, and his BA degree in environmental studies, English, and biology from St. Olaf College.
You can contact or verify outreach from Tim by emailing tim.dechant@techcrunch.com .

Scale faster. Grow your portfolio. Gain practical expertise. No matter your goal, Disrupt can empower you. Save up to $330 toda y!
Claude Opus 5 became downright ruthless when tasked with running a vending machine
DoorDash is building its own drone delivery business
Sam Altman is ready to decelerate
Data centers may face temporary power cuts to prevent blackouts on largest US grid
PSA: Your Claude shared chats and Artifacts may have ended up on Google
Kalshi demands Netflix take down trailer for ‘Prediction Games’ documentary
Librarians are hosting viral ‘Avoiding AI’ workshops for people who are fed up with Big Tech
Verified source · TechCrunch
Reported by TechCrunch. Open the original for full media and formatting.
More in More
All news
MoreCan Aequs Build A Consumer Engine Under Its Aerospace Wings?
Aequs’ consumer electronics business generated 19% of its overall top line during the quarter, more than double its revenue share a year ago.
Read at Inc42
MoreTomodachi Life: Living the Dream is a quirky life sim that’s worth buying at this discount
Looking to start your own island paradise full of Miis based on family, friends, and celebrities, but don’t feel like paying full fare? Woot has Tomodachi Life: Living the Dream for Switch on sale for $52.99 (usually $59.95). Sort of like Animal Crossing, but more off-kilter, th…
Read at The Verge
MoreD&D is getting World of Warcraft and Star Wars crossovers
Dungeons & Dragons is no stranger to franchise crossovers, and now it's kicking off its biggest multiverse initiative to date, starting with a World of Warcraft expansion. Wizards of the Coast (WotC) has announced that D&D: World of Warcraft - a new sourcebook that brings Blizza…
Read at The Verge
MoreThis tattoo is permanent, pain-free, and might soon come in the mail
The refurbished railway station in London I entered last week had none of the usual signs of being a tattoo studio. The walls were devoid of any art, and there were no reclining chairs or massage tables in the room. The only tattoo gun on the premises sat in a display case inste…
Read at The Verge